All case studies

One partner for 25 bespoke parts on a new flagship machine

A UK-headquartered manufacturer of processing equipment for the aggregates sector, developing a new large-scale system.

  • Quarrying, crushing and screening
  • Supplier qualification
  • Quality and compliance
  • Logistics and customs
  • Local stockholding
20%Cost saving across the programme
3 daysSupply of approved parts from local stock
25Bespoke part numbers managed

The challenge

The customer was developing a completely new, large-scale processing system. It needed around 25 bespoke part numbers spanning many materials and manufacturing processes, from small precision parts to high-tensile steel tie rods several metres long and close to a tonne each.

Other parts were just as demanding, including stainless-steel guide rails with very tight flatness and dimensional tolerances, large-format polymer plates and precision-machined steel components. On a seven-figure programme, a problem with specification, machining accuracy or delivery could delay development of the whole machine.

What MMS did

  • Reviewed drawings and specifications with the customer’s engineering and purchasing teams
  • Identified and qualified specialist manufacturers for each material and process
  • Managed material selection and technical review
  • Arranged samples, factory audits, material certificates, inspections and factory acceptance testing where required
  • Coordinated production, freight, customs clearance and local stockholding

The result

The customer had a single point of contact across multiple factories, materials and processes. The programme delivered an estimated 20% cost saving, and approved components can now be supplied from local stock in around three days.

How the relationship grew

Annual spend is now around 50% higher than the original programme, with MMS supporting further products and projects beyond the original machine.

Developing a new machine with complex, multi-process parts? Talk to us about a single supply partner.

More case studies

Heating, ventilation and air conditioning

Taking the risk out of material choices on a new product launch

A UK heating systems manufacturer launched a new range with confidence after MMS guided material selection and finish across multiple plastic components.

  • New product introduction
  • Material selection
  • Quality and compliance

Medical equipment

Securing supply through a period of rapid growth

A healthcare equipment manufacturer kept production running through rapid growth with a flexible four-month stock buffer held by MMS.

  • Supply continuity
  • Local stockholding

Infrastructure and utilities

From five-month lead times to three-day call-off

An infrastructure products manufacturer cut lead times from five months to three days and saved 20% by moving overseas steel supply to MMS.

  • Supplier management
  • Quality and compliance
  • Logistics and customs
  • Local stockholding